top of page





1/3
Pedestrian Ramps - Manhattan
HWPR19M is a $9.5 million NYCDDC project which focused on the rehabilitation of Pedestrian Ramps through the Borough of Manhattan.
​
Work Completed Includes:
- Installation of 25,000 feet of concrete steel-faced
- Construction of new granite curbs
- Installation of 1,800 pedestrian ramps as per ADA standards
- Installation of 100,000 ft of 7 inch unpigmented concrete sidewalks
- Installation of 20,000 ftof 4 inch unpigmented concrete sidewalks
- Installation of 35,000 ft of 7 inch & 4 inch pigmented concrete sidewalks
- Construction of Pavement Keys at Pedestrian ramps
- Pruning and protection of trees
- Installation of Pavement markings